Power Transformer Foundation — Jeddah Industrial Zone
Reinforced concrete foundations for 132 kV power transformers, engineered for seismic loads and heavy equipment anchorage in an active industrial corridor.
Elite Structure delivered precision-engineered transformer foundations for a utility-scale power distribution upgrade in Jeddah's industrial sector. The scope included soil assessment coordination, reinforced concrete pours to exacting tolerances, anchor-bolt placement, and post-pour quality verification aligned with utility specifications. The project demanded tight scheduling around live grid operations, with phased pours and continuous structural oversight to ensure long-term durability under sustained vibration and thermal cycling.
Project Details
- Location
- Jeddah
- Category
- Infrastructure
- Status
- Completed
- Year
- 2024
- Project Scale
- 4 transformer bays · 680 sq.m total footprint
- Client
- Government utility
- Duration
- 14 months
Request a Quotation
Share your drawings or project brief and our team will respond with a tailored proposal.
Request Quotation