ELITESTRUCTURE
Back to Projects

Power Transformer Foundation — Jeddah Industrial Zone

Reinforced concrete foundations for 132 kV power transformers, engineered for seismic loads and heavy equipment anchorage in an active industrial corridor.

Elite Structure delivered precision-engineered transformer foundations for a utility-scale power distribution upgrade in Jeddah's industrial sector. The scope included soil assessment coordination, reinforced concrete pours to exacting tolerances, anchor-bolt placement, and post-pour quality verification aligned with utility specifications. The project demanded tight scheduling around live grid operations, with phased pours and continuous structural oversight to ensure long-term durability under sustained vibration and thermal cycling.

Project Details

Location
Jeddah
Category
Infrastructure
Status
Completed
Year
2024
Project Scale
4 transformer bays · 680 sq.m total footprint
Client
Government utility
Duration
14 months

Request a Quotation

Share your drawings or project brief and our team will respond with a tailored proposal.

Request Quotation